Goals
Construction of partitions. Execution of false ceilings. Creation of a shadow seal around the walls. Execution of the interior perimeter lining. Execution of the lining. Creation of niches in the bathrooms. Gypsum plastering of walls and ceilings. Smoothing of the entire surface. Installation of Variovlies on walls. Painting of walls and ceilings. Enamel paintings of bathrooms (walls and ceilings). Painting of skylight embrasures. Painting of the old wooden beams. Painting of door frames on the ground floor. Painting of the office cabinets. Execution of plastering of the basement access staircase.
Period
November 2022
Type of services
Plastering & Painting, Insulation